Télécharger Imprimer la page

ABB RVT6 Instructions D'installation, D'utilisation Et D'entretien page 592

Publicité

Step 1
(a)
Note: cut out dimensions are 138x138 mm.
IP54 sealing installation
• Step 1: Slide the RVT (a) perpendicularly to the capacitor bank
cubicle.
• Step 2: Rotate the RVT (b) to insert it into the capacitor bank
cubicle.
• Step 3: Insert the mounting bracket (c) in the corresponding
fixation holes (d) of the RVT.
• Step 4: Pull the mounting bracket backwards.
• Step 5: Place the 1
IP54 sealing gasket between the front
st
s.a. ABB n.v.
Power Quality Products
Allée Centrale 10 Z.I. Jumet
B-6040 Charleroi (Jumet)
Belgium
Phone: +32(0) 71 250 811
Fax: +32(0) 71 344 007
Email: power.quality@be.abb.com
new.abb.com/high-voltage/capacitors/lv
Step 2
(b)
We reserve the right to make technical
changes or modify the contents of this
document without prior notice. With re-
gard to purchase orders, the agreed par-
ticulars shall prevail. ABB does not accept
any responsibility whatsoever for potential
errors or possible lack of information in
this document.
We reserve all rights in this document and
Step 3
Step 4
(c)
(d)
Step 5
(e)
Repeat steps 3 to 5 for the
bottom mounting bracket.
panel and the cubicle.
• Step 6: Turn lightly the screw (e) into the mounting brackets.
• Step 7: If any hole still exists (check the corners of the control-
ler) a 2
IP54 can be placed around the 1st one.
nd
• Step 8: Push on the gasket on 4 sides of the RVT to insert it
between the cubicle and the RVT enclosure so the gasket be-
comes invisible.
• Step 9: Turn the screw (e) into the mounting brackets and
tighten until the RVT is secured in place.
in the subject matter and illustrations con-
tained therein. Any reproduction, disclo-
sure to third parties or utilization of its
contents – in whole or in parts – is forbid-
den without prior written consent of ABB.
© Copyright 2018 ABB. All rights reserved.
Specifications subject to change without
notice.

Publicité

loading

Ce manuel est également adapté pour:

Rvt12Rvt12-3p