Télécharger Imprimer la page

ABB RVT6 Instructions D'installation, D'utilisation Et D'entretien page 11

Publicité

2 Installation
2.1 What this chapter contains
This chapter gives instructions to mount the controller on the panel and explains how to
make the electrical connection to the controller. The wiring diagram is shown in section
2.4.
2.2 Mounting
Please follow steps below to mount a RVT controller to a panel.
Step 1: Slide the RVT (a) perpendicularly to the Capacitor Bank Cubicle (b).
Step 2: Rotate the RVT to insert it into the Capacitor Bank Cubicle.
Note: cut out dimensions are 138x138 mm.
Step 3: Insert the Mounting Bracket (c) in the corresponding Fixation Holes (d) of the
RVT.
Step 4: Pull the Mounting Bracket backwards.
Step 5: Turn the Screw (e) into the Mounting Bracket and tighten until the RVT is secured
in place.
10 Installation ç Manual Power Factor Controller RVT
Step 2
(b)
Figure 5: Mounting a RVT
(a)
Step 1

Publicité

loading

Ce manuel est également adapté pour:

Rvt12Rvt12-3p