Installation Of The Machine - ELMECO BIG BIZ Manuel D'utilisation Et De Maintenance

Masquer les pouces Voir aussi pour BIG BIZ:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

During
maintaining
and
malfunctioning, disconnect the machine from the electric
network, by unplugging it - do not pull the wire but the plug
itself - (pic. 2 and 3).
Repairing must be made only by authorized and skilled
technicians. Reparations that are not state-of-the art may
be dangerous for the user. Please contact our company to
know the Authorized service center closer to you.
.
Before installing the machine, verify that:
• The machine is not damaged during the transportation. In case of doubts consult your
vendor;
• Big Biz is located far from any heating source;
• The power supply plant is endowed with a grounding system in accordance with applicable
law;
The electric capacity complies with the maximum power of the machine itself, as stated in
the plate
(pic. 4 page 18).
If any doubt or concern, please only contact trained and authorized personnel.
Carefully read the following instructions before installing the machine.
This machine must be used only for the purposes it was manufactured for. Any other use is to be considered as dangerous.
It is recommended that the installation is carried out by a skilled technician. The manufacturer will not be held responsible
under any circumstances for a wrong installation that could cause damage to people or things.
Once unpacked, verify that the machine is intact. The packing elements (plastic bags, expanded polystyrene, nails, etc.)
must not be left at children's reach as they can be dangerous.
During transportation, do not lift Big Biz by using the transparent tanks. Elmeco will
not be held responsible for the above mentioned wrong maneuvers
Place the machine far from any heating source. Verify it has sufficient free space (more or less 25 cm) around it (pic.5
pag.58).
Place the machine on a counter that can bear its load.
We recommend NOT to connect the machine through adaptors, multiple plugs and/or extensions.
If necessary, only use materials in accordance with the existing security laws concerning the power intensity as indicated
in the plate data (pic.4 page 18).
After connecting the machine to the electric network and switching it, verify the air flow from the side grids (pic.6 page
58).
cleaning,
or
in
case

Installation of the machine

of
Warnings
Installation
- 19 -

Publicité

Table des Matières
loading

Table des Matières