Checking And Setting The Side Rudder Linkage - Reely SKY Christen Eagle Notice D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

f) Checking and Setting the Side Rudder Linkage
First start running the transmitter then the model. The elevator control trim lever (fig. 2, pos. 9) must be in the middle position.
If the rudder flap (1) leans slightly to the left or right, you can adjust it by turning the clevis (2) to set the required length of rudder travel and thus exactly adjust
the side rudder flap.
If you push the left-hand control stick on the transmitter unit to the left (fig. 2, pos. 10), the side rudder flap (1) must extend some 2.5cm to the left.
42
Figure 10a
Figure 10b
Figure 10c

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

20 60 50

Table des Matières