Table des Matières

Publicité

7.

LIGHT WIND RELAUNCH

LWR INSTALLATION/TUNING
1
Pic 1-
Lay out your 20 M LWR flyline
and yellow leader. The end with the
size demarcation will end up at the
kite end of the assembled system.
4
Pic 4-
Slide the bar float up the
leader. Detach the blue leader line
from the control system leader knots.
Pull the blue leader line up through
the bar float.
7
Pic 7-
Pull the Blue and Yellow LWR
leader lines down through the bar
float using a flying line and the larks
head connection to the tabs.
20
naishkites.com
2
Pic 2-
Carefully thread the blue
control line through the guides on the
LWR Flyline.
Note:
It is important to always thread
the flyline through guide loop the
same direction. Failure to do so will
hinder the operation of the LWR
System.
5
Pic 5-
Feed the blue leader line
through the float reinforcement tube.
Hint:
You can use a flying line with a
larks head connection to help pull it
through.
8
Pic 8-
Connect the LWR leader to the
control system leader.
Note:
This must be below the main
flyline connection to maintain proper
left/right line lengths.
3
Pic 3-
Once the LWR flyline is as-
sembled on the blue flyline, attach
the yellow LWR leader. Use a loop-to-
loop connection.
6
Pic 6-
Pull the Yellow LWR leader line
through the float reinforcement tube
using the same technique.
9
Pic 9-
Slide the bar float back down
over the leader lines.

Publicité

Table des Matières
loading

Table des Matières