Readjusting The Venting Lever - Ecolab PDP II Notice Technique

Pompe doseuse pneumatique
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

10.4

Readjusting the venting lever

If, despite the venting lever being closed (see chapter 10.3.2, Fig. 10.2, pos. 4), product
escapes out of the return line, the venting lever must be readjusted.
To do so, proceed as follows:
Turn venting lever by 60° left (Fig. 10.4) and pull off.
Plug in venting lever on left stop position and turn right until there is no metering product
(Fig. 10.6) escaping from the venting line.
Pull off venting lever and push it back on 60° position (Fig. 10.4).
Close venting lever (turn right with the arrow in the 'up' metering direction) (Fig. 10.6).
Check for leaks in venting position (venting lever in left stop position).
If it is impossible to close the venting lever, or only possible with great force, proceed
as follows:
Pull off venting lever as in Fig. 10.4.
Turned approx. 15° to the right, push it back on.
Close venting lever (turn right with the arrow in the 'up' metering direction).
Check for leaks in operating position (Fig. 10.5).
Fig. 10.4
417101420_pneum_II.doc
Fig. 10.5
- 41 -
Fig. 10.6
Rev. 4-07.10

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Pdp 00030 pp 06 fp va pp 06 99 99 21 21 mePdp 00060 pp 06 fp va pp 06 99 99 21 21 mePdp 00120 pp 06 fp va pp 06 99 99 21 21 mePdp 00030 pp 06 fp va pp 06 14 14 21 21 mePdp 00060 pp 06 fp va pp 06 14 14 21 21 mePdp 00120 pp 06 fp va pp 06 14 14 21 21 me ... Afficher tout

Table des Matières