Installation; Hydraulic Connections; Product Connection - Serto System Di/Da 4; Product Connection - Universal System Di/Da 4/6 / 4/8 / 6 - Ecolab PDP II Notice Technique

Pompe doseuse pneumatique
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

8.

Installation

8.1

Hydraulic connections

8.1.1

Product connection - Serto System DI/DA 4/6

Fig. 8.1
8.1.2

Product connection - Universal System DI/DA 4/6 / 4/8 / 6/12

Fig. 8.2
8.1.3
Product connection –with firm cone DI/DA 4/6 / 6/8
Fig. 8.3
417101420_pneum_II.doc
Pos.
Description
A
Stop collar
1
Valve's connector nipple
2
Hose
3
Clamping ring
4
Union nut
Cut off hose (pos. 2) at right angles.
Push the union nut (pos. 4) and clamping ring (pos. 3) over the hose
(pos. 2).
Push hose (pos. 2) onto the valve's connector nipple (pos. 1) right up
to the stop collar (pos. A).
Tighten union nut (pos. 4).
Pos.
Description
A
Stop collar
1
O-Ring
2
Tapered part
3
Hose
4
Clamping ring
5
Union nut
Cut off hose (pos. 3) at right angles.
Push the union nut (pos. 5) and clamping ring (pos. 4) over the hose
(pos. 3).
Push hose (pos. 3) right up to the stop collar (pos. A) onto the valve's
connector nipple (pos. 2)
Put O-ring (pos. 1) in valve groove and tighten union nut (pos. 5).
Pos
Description
A
Stop collar
1
Integrated cone
2
Hose
3
Union nut
Cut off hose (pos. 2) at right angles.
Push the union nut (pos. 3) over the hose (pos. 2).
Push hose (pos. 2) right up to the stop collar (pos. A) onto the valve's
connector nipple (pos. 2).
Tighten union nut (pos. 3).
- 35 -
Rev. 4-07.10

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Pdp 00030 pp 06 fp va pp 06 99 99 21 21 mePdp 00060 pp 06 fp va pp 06 99 99 21 21 mePdp 00120 pp 06 fp va pp 06 99 99 21 21 mePdp 00030 pp 06 fp va pp 06 14 14 21 21 mePdp 00060 pp 06 fp va pp 06 14 14 21 21 mePdp 00120 pp 06 fp va pp 06 14 14 21 21 me ... Afficher tout

Table des Matières