7 Maintenance And Disposal - Nice Mindy A6 Instructions Et Recommandations Pour L'installateur

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 30
G) To see whether or not rotation direction is correct, give a short
pulse to the Step-by-Step input; the first manoeuvre the unit will
carry out after being powered on is always an OPEN one, so sim-
ply verify that the gate starts opening; if movement is wrong you
must proceed as follows:
1 - Turn power off
2 - Reverse the "OPEN" and "CLOSE" connections of the motor
or motors that are turning in the wrong direction.
Once this has been done, check if rotation direction is now correct,
repeating the procedure described in point "G".
H) Having checked all connections and motor rotation direction, it is
possible to try a complete movement of the actuators, we rec-
ommend that you always work in the manual mode with all func-
tions deactivated. If you use the Step-by-Step as the command
input, the first movement (after turning on) should be an opening
one. By means of the command inputs, move the gate until it
reaches the open point; if everything goes normally you can then
go on to the closing manoeuvre and move the gate until it reach-
es the stop point.
6.1) Commissioning
Commissioning can take place only after all the testing phases of the
control unit and the other devices have been completed successful-
ly. It is not permissible to execute partial commissioning or to enable
use of the system in makeshift conditions.
1. Prepare and store for at least 10 years the technical documenta-
tion for the automation, which must include at least the following:
assembly drawing of the automation, wiring diagram, analysis of
hazards and solutions adopted, manufacturer's declaration of con-
formity of all the devices installed (for A6 - A6F - A700F use the
annexed CE declaration of conformity); copy of the instruction man-
ual and maintenance schedule of the automation.
2. Affix a dataplate on the gate providing at least the following data:
type of automation, name and address of manufacturer (person
responsible for the "commissioning"), serial number, year of manu-
facture and "CE" marking.
3. Post a permanent label or sign near the gate detailing the opera-
tions for the release and manual manoeuvre.
4. Prepare the declaration of conformity of the automation system
and deliver it to the owner.
7) Maintenance and Disposal
!
This charter provides information about how to draw up a maintenance schedule, and the disposal of A6 – A6F –A700F.
7.1) Maintenance
The automation must undergo maintenance work on a regular basis,
in order to guarantee prolonged lifetime.
The maintenance operations must be performed in strict
compliance with the safety directions provided in this
manual and according to the applicable legislation and
standards.
If other devices are present, follow the directions provided in the cor-
responding maintenance schedule differents from A6 - A6F - A700F.
1. Is requires scheduled maintenance work every 6 months or
10,000 manoeuvres (max.) after previous maintenance.
2. Disconnect all power supplies.
It is worthwhile carrying out several open and close manoeuvres so
you can evaluate any defects in the automation's mechanical struc-
ture and also to pinpoint any specific points of friction.
I) Now test triggering of the safety devices; in the opening manoeu-
vre PHOTOCELL and PHOTOCELL 1 have no effect but in the
closing manoeuvre they will stop movement. If the PIU' card is
plugged in try functioning of the PHOTOCELL 2 input, in the clos-
ing manoeuvre it has no effect while in the opening manoeuvre it
will stop movement. The devices connected to the STOP input
act both in the opening and closing manoeuvres, stopping move-
ment each time.
L) The hazardous situations caused by the movement of the leafs
have been safeguarded by limiting the force of impact, the impact
force must be measured according to EN Standard 12445. If the
control of the "motor force" is used to assist the system for the
reduction of the impact force, try to find the adjustment to obtain
optimal results.
5. Prepare the "Instructions and warnings for the use of the automa-
tion system" and deliver it to the owner.
6. Prepare the maintenance schedule of the automation system and
deliver it to the owner (this must provide all directions regarding
the maintenance of the single automation devices).
7. Before commissioning the automation system inform the owner in
writing regarding residual risks and hazards (e.g. in the "Instructions
and warnings for the use of the automation system").
3. Check for any deterioration of the components which form the
automation, paying particular attention to erosion or oxidation of the
structural parts. Replace any parts which are below the required
standard.
4. Connect the electric power sources up again, and carry out the
testing and checks stated in Paragraph "6 Testing".