Commissioning; Before Switching On - Lenze 8200 motec Instructions De Montage

Masquer les pouces Voir aussi pour 8200 motec:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

)
Note!
Do not change the switch−on sequence.
l
In the event of an error during commissioning please see the
l
chapter "Fault detection and elimination".
Check the following to avoid damage to persons or material...
...before the mains voltage is connected:
Wiring for completeness, short circuit and earth fault
l
"Emergency−off" function of system
l
Motor connection (star/delta) must be adapted to output voltage of
l
controller.
If you do not use a function module ensure that the FIF cover is
l
mounted properly (as delivered).
If the internal voltage supply is connected, for instance, to X3/20 of
l
the standard−I/O, terminals X3/7 and X3/39 must be bridged.
... the most important drive parameter settings before the controller is
enabled:
Are the drive parameters relevant for your application set correctly?
l
– e. g. configuration of analog and digital inputs and outputs
L
EDK82MV222 DE/EN/FR 8.0

Commissioning

Before switching on

7
101

Publicité

Table des Matières
loading

Table des Matières