Mains Connection 230 V/240 V; Fuses And Cable Cross-Sections - Lenze 8200 vector Instructions De Montage

Masquer les pouces Voir aussi pour 8200 vector:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Show/Hide Bookmarks
Electrical installation
3

Mains connection 230 V/240 V

Fuses and cable cross-sections

Type
Type
Mains
Mains
E82EV251K2B
E82EV371K2B 1/N/PE AC
1/N/PE AC
E82EV551K2B
2/PE AC
E82EV751K2B
180 ... 264 V;
E82EV152K2B
45 ... 65 Hz
E82EV222K2B
E82EV551K2B
3/PE AC
E82EV751K2B
100 ... 264 V;
E82EV152K2B
45 ... 65 Hz
E82EV222K2B
1)
Use UL-approved cables, fuses and fuse holders only.
UL fuse: voltage 240 V, tripping characteristic "H" or "K5"
2)
Pulse-current or universal-current sensitive earth leakage circuit breaker
3)
All-current sensitive e.l.c.b.
Observe national and regional regulations (e. g. VDE 0113, EN 60204)
Please observe the following when using e.l.c.bs:
E.l.c.bs must only be installed between mains supply and controller.
l
E.l.c.bs can trip incorrectly because of
l
– capacitive leakage currents of the cable shields during operation (especially with long,
shielded motor cables),
– simultaneous connection of several controllers to the mains supply,
– use of additional RFI filters.
16
Installation to EN 60204-1
Fuse
E.l.c.b.
L1, L2, L3, N, PE
M10 A
C10 A
M10 A
C10 A
M10 A
B10 A
M16 A
B16 A
M20 A
B20 A
M20 A
B20 A
M6 A
B6 A
M10 A
B10 A
M16 A
B16 A
M16 A
B16 A
EDK82EV222 DE/EN/FR 6.0
Installation to UL
Fuse
L1, L2, L3, N, PE
2
[mm
]
1
10 A
1.5
10 A
1.5
10 A
2.5
15 A
2 x 1.5
20 A
2 x 1.5
20 A
1
5 A
1.5
10 A
2.5
15 A
2.5
15 A
1)
FI
FI
[AWG]
18
16
16
2)
≥ 30 mA
14
2 x 16
2 x 16
18
16
3)
≥ 30 mA
14
14
L

Publicité

Table des Matières
loading

Table des Matières