Preparation For Use; Mattress Installation; Atmosair 9000A Mrs - arjo AtmosAir 9000A Manuel D'utilisation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 74

Preparation for Use

For information concerning the bed frame, refer to the manufacturers'
User Guide.
1.
Open shipping container(s).
Do not use sharp instruments to open boxes. Damage to mattress
could result.
2.
Remove AtmosAir 9000A MRS from plastic protective cover.
The mattress cover may appear wrinkled when unpacked. To remove
wrinkles, allow mattress up to 24 hours to accommodate; see
Troubleshooting for more information. Wrinkles will not a ect in ation
or function, so mattress may be used immediately if needed.
3.
present.
4.
If re-installing mattress onto a new frame or for a new patient, check mattress
Cleaning).
5.
Level bed and lock brakes.
6.
Remove existing mattress from bed frame.

Mattress Installation

AtmosAir 9000A MRS

1.
Position mattress on bed frame with logo facing up and product information tags
at foot end of bed.
2.
Ensure there are no gaps between mattress and bed frame or side rails.
Always use a standard healthcare bed frame with safeguards or
protocols that may be appropriate. Frame and side rails must be
properly sized relative to the mattress to help minimize any gaps that
might entrap a patient's head or body.
Care and
5

Publicité

Table des Matières
loading

Table des Matières