Preventive Maintenance Schedule; Daily Cleaning; Weekly Cleaning; Inspection / System Checks - arjo AtmosAir 9000A Manuel D'utilisation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 74

Preventive Maintenance Schedule

Preventive maintenance for the AtmosAir MRS consists of regular cleaning (see Care and
Cleaning) and an overall system check-out to be performed at the intervals described below.
All components must be cleaned, disinfected and inspected after each patient's use and
before use by a new patient. Always use standard precautions, treating all used equipment
as contaminated. Institutions should follow local protocols for cleaning and disinfection.

Daily Cleaning

The cover should be wiped daily with a mild soap and water solution. After wipe down,
dry surface with a towel.

Weekly Cleaning

The pump and hoses should be cleaned weekly.

Inspection / System Checks

Check each of the following before placing the AtmosAir MRS with a new patient:
1.
are present.
2.
Ensure mattress is free of stains and is not overly faded.
3.
Ensure air inlet hoses and connectors on mattress and pump are clean
and undamaged.
4.
Ensure pump and power cord are clean and undamaged.
5.
Ensure pump hanger brackets are secure and operate correctly.
6.
Ensure power switch and comfort control knob operate correctly.
7.
Attach pump to the hoses and power on to ensure there are no air leaks.
11

Publicité

Table des Matières
loading

Table des Matières