Bleeding The System En - Abicor Binzel CR1000 Mode D'emploi

Masquer les pouces Voir aussi pour CR1000:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

6 Putting into operation
NOTICE
• Make sure that the coolant supply and return have been installed properly.
• For liquid-cooled welding torches, we recommend using ABICOR BINZEL BTC coolant.
• To ensure the maximum cooling capacity, check the condition of the coolant regularly.
6.3.1 Bleeding the system
Optimum cooling is only guaranteed if the air has been bled from the entire cooling system.
Bleed the entire cooling system as follows when used for the first time and after every cable assembly
replacement:
1 Connect the intermediate cable assembly coolant hoses to the cooling unit and make sure that the entire
coolant circuit is closed.
2 Switch on the cooling unit on the front of the device.
3 Disconnect the coolant return hose from the cooling unit and hold it over a collection receptacle.
4 Close the coolant return hose and release it again by repeatedly and abruptly opening it.
NOTICE
• Repeat this procedure until the coolant drains out continuously and without air entrapment.
• Check the minimum fill level on the cooling unit.
• Check the tightness of the connectors and nozzles to prevent coolant leakage!
5 Reconnect the coolant return hose.
6 Check the coolant fill level.
EN - 16
Coolant supply = blue, coolant return = red.
CR1000/CR1250

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Cr1250

Table des Matières