Before Initially Putting Into Operation En - Abicor Binzel CR1000 Mode D'emploi

Masquer les pouces Voir aussi pour CR1000:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

CR1000/CR1250
6.3 Before initially putting into operation
Coolant supply (blue)
1
Screw cap
2
Front/rear
Fig. 7
1 Connect the coolant hoses.
2 Open the screw cap (2) on the filler neck (3) of the coolant container (4).
3 Fill the cooling unit with ABICOR BINZEL BTC coolant up to the maximum fill level mark on the
container. Do not close the filler neck.
4 Switch on the cooling unit.
5 Fill the cooling unit at the filler neck (3) of the coolant container (4) with ABICOR BINZEL BTC coolant
up to the maximum fill level mark on the container.
6 Repeat this procedure approx. 2-3 times until the cooling liquid is distributed throughout the entire coolant
circuit and the maximum fill level has been reached.
7 Close the filler neck (3) with the screw cap (2).
Damage caused by unsuitable and conductive cooling liquids is not covered by the
warranty.
• Prior to refilling the cooling system with BTC coolant, the system must be rinsed with clean water to
• If other cooling liquids are used, they must not contain any aggressive, abrasive or resinous
• If ABICOR BINZEL BTC coolant is not available, deionized water (permitted operating temperature
1
2
6
Filler neck
3
Coolant container
4
CAUTION
remove any residues.
components.
+5°C to +40°C) or, after cleaning the device, a mixture of 25% monoethylene glycol and 75%
deionized water (permitted operating temperature -10°C to +40°C) can be used.
6 Putting into operation
3
4
5
Outlet neck
5
Coolant return (red)
6
EN - 15

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Cr1250

Table des Matières