Dosage Operation; Programming The Dose On The Control Unit - Iberital Expression Pro Manuel D'installation

Masquer les pouces Voir aussi pour Expression Pro:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 111
IBERITAL

2.3. DOSAGE OPERATION

It is important to remember that the buttons and control units receive signals in the two main switch supply positions on
the machine.
Position 1
2
1
In the first position, the switch will only operate the automatic water filling, but not the heating elements.
Position 2
2
1
In the second position, the switch receives a signal from the starter relay (optional) and this allows the machine to be
heated and dispense coffee. It is recommended that this be done when the machine is hot and the working pressure in
the boiler(s) has been reached, as indicated by the green range on the gauge (11), and/or shown on the display, if the
machine has one.
NOTE
If our model only has a 2-position main switch (ON-OFF), when it is switched on the boiler will begin to
fill, if not already full. When the machine detects that the minimum level of water has been reached, it will
begin to heat the water to make the coffee.
2.3.1. Programming dose on the control unit (not available on semi-automatic
versions)
In order to program the dose you must press the 'non-stop' button on the left button pad (group 1) for 5 seconds, and
the non-stop coffee LED will come on (*).
Iberital IB7
70
1. Level sensor
2. Solenoid valve
3. Pump
3
1. Level sensor
2. Solenoid valve
3. Pump
3
Iberital Intenz
New Iberital / Expression PRO
INSTALLATION AND OPERATION MANUAL

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

New iberitalIberital intenzIb7

Table des Matières