IBERITAL
3.6.6. Flow control valves
a) Expansion valve (crucible for opening to 1.2 MPa ±0.1).
3.7. PUMP/MOTOR
a) Lock nut.
b) Adjustment screw.
The pump/motor starts up when any button on the button pad is pressed, increasing the pressure up to the 0.8/0.9 MPa
necessary to prepare the coffee. The pump/motor are also controlled by the automatic level control device, which keeps
the boiler filled with water.
In order to regulate the pump pressure, proceed in the following manner: loosen the lock nut, which holds the adjustment
screw. Loosen the screw to reduce the pressure, or tighten it to increase it. When the operation is complete, make sure
the lock nut is tightened once more.
4. LIFE CYCLE MANAGEMENT
4.1. PACKAGING
For the good of the environment, separate the waste from the packaging for recycling or reuse.
Cardboard, wooden parts, plastic bags and polystyrene blocks can be recycled.
Dispose of the protection foam and take them to the nearest waste disposal point.
4.2. EFFICIENT USE OF THE MACHINE
It is recommended that the user keep the machine turned off during long periods of inactivity, such as at night, and public
holidays and vacation periods.
4.3. END OF THE APPLIANCE CYCLE
The elimination of this device is regulated by Royal Decree 110/2015 of Spain based on European Directive 2012/19/EU.
Find out about disposal routes from your distributor and/or manufacturer.
108
INSTALLATION AND OPERATION MANUAL