Télécharger Imprimer la page

ATH-Heinl ATH-W Serie Manuel D'instructions page 91

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 131
2.6
Electrical Connection
General and local regulations must be observed. Therefore, these steps may only be
carried out by a trained professional.
Pay attention to the necessary supply line (see technical data).
The connection should be made with a 230V Schuko plug or 5-phase 16 A CEE plug (partially included).
Voltage deviations should be 0.9 - 1.1 times the nominal voltage range and the frequency deviation should
be 0.99 - 1.01 times the frequency range.
Necessary protective measures must be taken to guarantee this.
At the end of the work, the direction that the motor rotates must be checked.
2.7
Pneumatic Connection
For all pneumatic systems, a compressed air maintenance unit (partially included) must
be installed between the supply line and the system.
The air pressure of the supply line must at least correspond to the technical data.
The compressed air maintenance unit must be set correctly and checked.
The compressed air maintenance unit must be serviced at regular intervals.
The maximum or minimum pressure ensures perfect functioning without any damage.
2.8
Assembly
These instructions are not to be viewed as assembly instructions; hints and tips are
provided only for trained expert installers. Suitable clothing and personal protection must
be worn for the following work.
Incorrect installation and settings lead to exclusion of liability and warranty.
Partly pre-assembled machines must be checked, introduced and approved by a competent person before
commissioning.
Machine assembly must be carried out by a qualified and competent person.
2.8.1.
a. Remove the balancing machine from the shipping pallet. Use the support points that are
specially designed for this purpose to do this. Under no circumstances should the machine
be lifted on other points, e.g. the shaft, the display or the accessory panel.
b. The machine must be firmly positioned on the ground using the special support points and,
if necessary, washers must be used.
® Copyright ATH-Heinl GmbH & Co. KG, All rights reserved / Misprints and technical changes reserved / As of: 2021-10
Setting up the balancing machine
- 26 -

Publicité

loading

Ce manuel est également adapté pour:

Ath-w82