Télécharger Imprimer la page

LEGRAND KEOR HP 400kVA Installation Et Démarrage page 31

Publicité

Les langues disponibles

Les langues disponibles

Installation and start-up of UPS Keor Hp 400-800kVA
Installation et démarrage de l'UPS Keor Hp 400-800 kVA
Installazione e avviamento UPS Keor Hp 400-800kVA
KEOR HP 800kVA
Power connections
between CABINET 1 (Static switch) and CABINET 2 (Rectifier/Inverter 1)
Cables or bars to connect
Flex bar
Cable
Mobile connector 21N
Flex bar
Earth cable yellow/green
Signal connections
between CABINET 1 (Static switch) and CABINET 2 (Rectifier/Inverter 1)
Cables to connect
Mobile connector CN1/CN2/CN3
Mobile connector W22/N
Flat
Power connections
between CABINET 2 (Rectifier/Inverter 1) and CABINET 3 (Rectifier/Inverter 2)
Cables or bars to connect
Flex bar
Copper bar
Power cable
Power cable
Earth cable yellow/green
Signal connections
between CABINET 1 (Static switch) and CABINET 2 (Rectifier/Inverter 1)
Cables to connect
Mobile connector CN4/CN5
Flat
7A/8A/9A/7B/8B/9B
21
22/23/24
W10/W11/W12
W10C/W11C/W12C
W53/W54/W55/W61A
W18A/W18B
7B/8B/9B
+R/46/-R
21N/N3-S3/N2-S2/N1-S1
21B/22A/23A/24A
W10B/W11B/W12B
W10AB/W11AB/W12AB
W53B/W54B/W55B
W61B
Notes
Connect to fuses F1A/F2A/F3A/F1B/F2B/F3B
Connect to neutral copper bar (2N-3N)
Connect to respective permanent connector
Connect to terminals 22/23/24
Connect to screw M10
Notes
Connect to respective permanent connector
Connect to respective identified connector
Connect to J2 connector in their Flat-Flat
board
Notes
Connect to respective identified isolator
support
To connect +R/46/-R copper plates
between the two Rectifier/Inverter
cabinets
Connect to terminals 21N/N3-S3/N2-
S2/N1-S1
Connect the cables on the output
capacitors in the respective points
identified
Connect to screw M10
Notes
Connect to respective permanent
connector
Connect to J2 connector in their Flat-Flat
board
OMD39075 REV. F
31

Publicité

loading

Ce manuel est également adapté pour:

Keor hp 500kvaKeor hp 600kvaKeor hp 800kva