Télécharger Imprimer la page

LEGRAND KEOR HP 400kVA Installation Et Démarrage page 20

Publicité

Les langues disponibles

Les langues disponibles

3.2
HANDLING OF THE UPS
The UPS is packed on a pallet. It is handled from the transport vehicle to the installation (or
storage) place via a fork lift.
The device has a heavy weight
 Avoid turnover during the transport of the UPS.
 Cabinets must always be handled in upright position.
 During loading and unloading operations, always respect the indications
regarding the device barycentre marked on the package.
To handle the UPS remove the lower front and rear panel and insert the forks of a fork lift.
Picture 2 – Handling of UPS KEOR HP 400kVA
20
OMD39075 REV. F
Installation and start-up of UPS Keor Hp 400-800kVA
Installation et démarrage de l'UPS Keor Hp 400-800 kVA
Installazione e avviamento UPS Keor Hp 400-800kVA

Publicité

loading

Ce manuel est également adapté pour:

Keor hp 500kvaKeor hp 600kvaKeor hp 800kva