Télécharger Imprimer la page

LEGRAND KEOR HP 400kVA Installation Et Démarrage page 30

Publicité

Les langues disponibles

Les langues disponibles

3.3.5 Connection between the single cabinet
KEOR HP 400kVA
Power connections
between CABINET 1 (Static switch) and CABINET 2 (Rectifier/Inverter)
Cables or bars to connect
Flex bar
Cable
Mobile connector 21N
Flex bar
Ground cable yellow/green
Signal connections
between CABINET 1 (Static switch) and CABINET 2 (Rectifier/Inverter)
Cables to connect
Mobile connector CN1/CN2/CN3
Mobile connector W22/N
Flat
KEOR HP 500-600kVA
Power connections
between CABINET 1 (Static switch) and CABINET 2 (Rectifier/Inverter)
Cables or bars to connect
Flex bar
Cable
Mobile connector 21N
Flex bar
Earth cable yellow/green
Signal connections
between CABINET 1 (Static switch) and CABINET 2 (Rectifier/Inverter)
Cables to connect
Mobile connector CN1/CN2/CN3
Mobile connector W22/N
Flat
30
OMD39075 REV. F
Installation and start-up of UPS Keor Hp 400-800kVA
Installation et démarrage de l'UPS Keor Hp 400-800 kVA
Installazione e avviamento UPS Keor Hp 400-800kVA
4/5/6
21
22/23/24
W10/W11/W12
W10A/W11A/W12A
W53/W54/W55/W61
+R/46/-R
21
22/23/24
W10/W11/W12
W10A/W11A/W12A
Notes
Connect to EMI FILTER
Connect to neutral copper bar (2N-3N)
Connect to respective permanent connector
Connect to terminals 22/23/24
Connect to screw M10
Notes
Connect to respective permanent connector
Connect to respective identified connector
Connect to J2 connector in their Flat-Flat board
Notes
Connect on the +R/46/-R copper bar in the
respective points identified
Connect to neutral copper bar (2N-3N)
Connect to respective permanent connector
Connect to terminals 22/23/24
Connect to screw M10
Notes
Connect to respective permanent connector
There is CN3 connector only with some option
Connect to respective identified connector
Connect to J2 connector in their flat-flat board

Publicité

loading

Ce manuel est également adapté pour:

Keor hp 500kvaKeor hp 600kvaKeor hp 800kva