Télécharger Imprimer la page

FAS International SKUDO Mode D'emploi page 64

Publicité

Les langues disponibles
  • FR

Les langues disponibles

14
To switch on the machine, follow the instructions below. To connect the wiring cable. If the message
"MEMORY CLEARED" appears on the display, press the button on the main board inside the box of the
coin dispensing mechanism to initialize the memory. The message "DOOR OPEN" appears on the
E
display. The vending machine will automatically start a self-test. If no errors are identified, the machine is
N
ready to use.
G
Programme the machine (see chap. "PROGRAMMING") and set the prices.
L
If the machine is supplied with change-giving mechanism, insert the corresponding coins in the change-
I
giving tubes.
S
Load the machine with products (see paragraph Loading the products).
H
6.4
WARNINGS FOR THE INSTALLATION
The machine is sold without payment system. Therefore whatever default to the machine or damages to
person or things due to an incorrect installation, use or similar caused by the payment system will be only
and exlusively charged to those who have carried out the installation of the machine.
6.5
PAYMENT SYSTEM CONNECTION
The coin mechanism must be connected and disconnected
with the machine switched off.
The connectors required to connect the coin mechanism are
located next to the main board. The vending machine is set up for
payment systems with EXECUTIVE, MDB and BDV protocols.
Fasten the coin mechanism on the support between the two
pins.
Connect the coin mechanism connectors to the machine.
Adjust the coin chute on the coin mechanism opening
Adjust the coin return button leverage
If the machine is disassembled in order to be definitively demolished, it is obligatory to follow the rules in
force regarding the protection of the environment.
All ferrous, plastic or similar materials should be taken to the authorized depots.
Particular care should be given to:
Should you have any queries, you are recommended to contact competent local refuse disposal authorities.
FAS INTERNATIONAL S.p.A. Via Lago di Vico, 60 SCHIO (VI) – tel. +39 0445 502011 – fax +39 0445 502010 - e-mail: info@fas.it
7
WARNINGS FOR THE DEMOLITION OF THE MACHINE
Whichever type of gases (see identification plate) present in the refrigeration unit
should be recovered with suitable equpment by specialized firms.
Insulation materials should be recovered by specialized firms.
Disposal
in
compliance
implementation of the Directive into the national law.
This equipment complies with Directive 2002/95/EC (RoHS).
MASTER / SLAVE CONNECTION
Up to two SLAVE machines (FAST FULLVIEW or FASTER
FULLVIEW) can be connected to the MASTER machine. A
serial cable is used for each connection, and the connectors
are accessible from the rear of the machine. Either one of
the connectors indicated by the arrows can be used for the
MASTER/SLAVE connection.
It is also be possible to connect a Stand-Alone in Slave
mode, see command 58.
with
EU
2002/96/EC
SKUDO – Issue 00
standards,
according
to
the

Publicité

loading