Mounting The S9M; Mounting With Tension/Compression Bars - HBM S9M Notice De Montage

Masquer les pouces Voir aussi pour S9M:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Mechanical Installation
Rigid force transfer
Fig. 7.1
Transducer orientation during mounting
Notice
Please note the maximum permissible load­carrying capacity of the loading
fittings and of the tension/compression bars, screws and knuckle eyes.
7.3

Mounting the S9M

7.3.1

Mounting with tension/compression bars

In this mounting variant, the transducer is mounted with tension/compression
bars on a construction element and can then be measured in the tensile and
compressive directions. Alternating loads are also correctly recorded if the
transducer is mounted without axial play. For dynamic alternating loads, the
upper and lower threaded connectors must be pre-stressed to above the maxi­
mum operating load and then locked in place.
1. Installation and locking with initial stress (recommended mounting variant):
- Screw in the threaded connector
- Pre-stress transducer to 110% operating load in tensile direction
- Hand-tighten the locknut
- Unload the transducer
16
Ó Ó Ó
correct
A03019_05_YI0_04 HBM: public
Rigid force transfer
Ó Ó Ó
incorrect
S9M

Publicité

Table des Matières
loading

Table des Matières