Commissioning
Measures prior to commissioning
Operating instructions
10
n
Check that the plant main switch (if installed) is switched on.
n
Check that the controller is switched on and energised.
n
Check that all segments on the display are shown briefly
Ä Chapter 4.2 "Display" on page 14 ).
(
n
Check that the software number and version are displayed (e.g.
519803 / SW 1.01).
The commissioning menu is displayed during initial
start-up and after a factory reset BAS12 RESET . This
is used to set the basic parameters.
In order to switch from ENGLISH to DEUTSCH for example, press
1.
the
buttons.
ð DEUTSCH flashes.
Commissioning