Quick Start Settings - IMEON ENERGY HV Notice De Montage Et Guide De Montage

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Feed in Priority: PV power is used to supply consumers, then inject the surplus into
the public grid, then charge the battery if there is a surplus.
Back up mode: This is the "Force Time Use" mode with the particularity that outside
of charging periods the battery will only be discharged when the network is absent.
Peak and valley mode: This is the "Force Time Use" mode with the particularity that
there are also periods of discharge. So :
FR
EN
FR
4.4.
When the inverters first turn on, it is mandatory to set inverters by following step by step
the LCD requirements.
After validation of all these settings, the inverter will start and synchronize all the inputs /
outputs.
62
IMEON HV
possible to choose whether the batteries are charged by PV power only or
by the public grid as well.
Outside these periods, the principle remains the same as the "Self-Use"
o
mode.
o
During charging periods, the battery will be charged by the PV power and
the public grid at the set power.
o
During discharging periods, the battery will be discharged at the set power.

Quick start settings

Date time
Safety
Export limit power
Battery parameters (You need to set the charge voltage according to the number of
battery use, i.e.212V if 4 batteries are used (53V x 4)).
Work mode
IMEON HV – Guide d'installation / Installation guide – Rev A.4