Installation and initial commissioning

8.3 Foundation and floor

Requirements for the concrete floor slab:
9 Installation and initial commissioning
92
DANGER
Risk of death and injury from asphalt ground
Only use the lifting system on level, statically tested floor slabs.
Required concrete quality: C20 / 25 with a minimum load-bearing capacity of
20 MPa.
Minimum thickness of the bottom plate 115 mm.
Maximum permissible transverse angle to the vehicle: 1% (10 mm / m).
Maximum permissible longitudinal angle to the vehicle: 2% (20 mm / m).
DANGER
Risk of death and injury due to improper installation
Installation, maintenance and repair work may only be carried out by
trained and authorised specialists whilst the system is switched off and
secured.
Work on the electrical equipment of the system may only be carried out by
electricians.
Work on hydraulic equipment may only be carried out by qualified
personnel with special knowledge and experience in hydraulics.
126746