Maintenance - Ingersoll Rand IRN 7.5 HP Manuel D'utilisation Et D'entretien

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Maintenance Schedule
PERIOD

MAINTENANCE

Each 24 hours
Check the coolant level and replenish if
operation
necessary.
Visual check of
Report immediately, contact Ingersoll Rand
machine for any
authorized distributor for assistance if in
leaks, dust build up
doubt
or unusual noise or
vibration
When compressor
Drain air receiver of condensate, or check
is receiver mounted
that automatic drain is operating
Visual check
Blow clean if needed
condition of
package pre filter
First 150 hours
Change the coolant filter.
Each month or 100
Remove and clean package pre filter,
hours
replace if needed
Check the cooler(s) for build up of foreign
matter. Clean if necessary by blowing out
with air or by pressure washing.
CONDENSER
Every 4 months
Remove any dust from the condenser fins.
COMPRESSOR
Make sure compressor power consumption
complies with data plate specifications.
http://air.ingersollrand.com
MAINTENANCE
PERIOD
MAINTENANCE
Each year or
Check the operation of the high
2000 hours
temperature protection switch (109_C).
Change the coolant filter.
Check scavenge screen for blockage,
clean if required.
Replace elements in IRGP and IRHE
filters.
Change the separator cartridge.
Change the Air Filter element.
Take coolant sample for fluid analysis.
Change the package pre filter.
CONDENSATE DRAINS
Completely disassemble the drains and
clean all their components.
Every two years or
Replace the Ultra Coolant at
8000 hours
whichever interval occurs first.
Check and replace all items included within
2000 hour service
Every 4 years or
Replace sealed bearing on IP65 motors.
16000 hours
s
Fit replacement electrical contactor tips.
33
IRN 7.5 - 15 HP (5.5 - 11 kW)

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Irn 10 hpIrn 15 hp

Table des Matières