System Architecture - Aventics HF03 Mode D'emploi

Système de distributeurs
Masquer les pouces Voir aussi pour HF03:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

During commissioning
During operation
During cleaning
AVENTICS | HF03/HF02 | 1987765472–BDL–001–AB
W
Installation may only be performed in a voltage-free and
pressure-free state and only by a qualified technician. In
order to avoid accidents caused by dangerous movements
of the actuators, electrical commissioning may only be
carried out in a pressure-free state.
W
Do not put the system into operation before it is completely
assembled as well as correctly wired and configured, and
after it has been tested.
W
The device is subject to the restrictions of the IP 65
protection class. Before commissioning, make sure that all
the connection seals and plugs are leaktight to prevent
fluids and foreign bodies from penetrating the device.
W
Make sure that there is a sufficient exchange of air or
enough cooling if your valve system has any of the following:
– Full equipment status
– Continuously loaded solenoid coils
W
Never use solvents or strong detergents. Only clean the
device using a slightly damp cloth. Only use water and, if
necessary, a mild detergent.
3

System architecture

The versatility and flexibility of this valve system enable
AVENTICS to support your automation tasks. The valves are
completely mounted and tested according to your requirements;
the electrical connection is made via multiple plug connectors.
The valve system in the local and external pilot control versions
is then ready for use. Its modular construction allows existing
systems to be expanded or converted at any time.
The valve system's operating instructions are composed of
individual components.
47
System architecture

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Hf02

Table des Matières