Battery Test; Setting The Display Network Parameters - LEGRAND VR61-18 Manuel De L'utilisateur

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

The various parameters setting pages are similar to each other and requires the operator to
enter and confirm the value; the setting page of the battery capacity is given below as a
reference.
Picture 23 – Battery parameters setting

5.3.8 Battery test

The BATTERY TEST section allows to carry out a short discharge test of the battery. In case
the battery is not efficient, the alarm "A10 – Battery fault" is generated at the end of the test.
Possible loss of supply
This test can affect the continuity of supply to the loads if the battery is not fully
charged.

5.3.9 Setting the display network parameters

The NETWORK CONFIG section allows to configure the parameters related to the LAN
network and to the system time synchronization server.
All the parameters that can be set in this section are related to the communication ports (LAN
and RS485) available on-board the touch screen.
36
OMP06145 REV. D
UPS user manual
Manuel de l'utilisateur de l'ASI
Utilizzo dell'UPS

Publicité

Table des Matières
loading

Table des Matières