General Information - Gaggenau AC230101 Manuel D'utilisation Et Notice D'installation

Masquer les pouces Voir aussi pour AC230101:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

en Installation instructions
installing a residual-current circuit breaker (RCCB)
in the appliance's power supply circuit.
Sharp-edged components inside the appliance may
damage the connecting cable.
Do not kink or trap the connecting cable.
¡ The connection data can be found on the rating pla-
te inside the appliance.
¡ To see the rating plate, remove the grease filter.
¡ The connecting cable is approx. 1.30 m long.
¡ This appliance complies with the EC interference
suppression regulations.
¡ The appliance corresponds to protection class 1.
Therefore, only use the appliance with a protective
earth connection.
¡ Do not connect the appliance to the power supply
during installation.
¡ Ensure that the protection against contact is guaran-
teed during installation.
¡ Only a licensed professional may connect applian-
ces without plugs. They are subject to the require-
ments of the local electricity provider.
16.7 General information
Follow these general instructions during the installation.
¡ For the installation, observe the currently valid buil-
ding regulations and the regulations of the local
electricity and gas suppliers.
¡ When discharging the exhaust air, the official and le-
gal regulations, such as the regional building code.,
must be observed.
¡ In order to freely access the appliance for servicing,
select an easy-to-reach installation site.
¡ The surfaces of the appliance are sensitive. Avoid
damaging them during installation.
16.8 Installation
Checking the ceiling
Check whether the ceiling is horizontal and ad-
1.
equately load-bearing.
The max. weight of the appliance is 40 kg.
Do not fit the appliance directly onto plasterboard
(or similar lightweight materials) in a suspended
ceiling.
Drill the hole depth in accordance with the length of
2.
the screws.
Install the appliance with a fixing material which is
3.
sufficiently stable and has been adjusted accord-
ingly for both the structural conditions and the
weight of the appliance.
Check the cut-out area for existing cables of other
4.
appliances.
Preparing the ceiling
1.
Cover the hob to prevent damage.
Determine the position of the appliance and,
2.
thereby, the centre based on the position of the
hob.
Ensure that there are no electrical wires, gas pipes
3.
or water pipes in the area where holes are to be
drilled.
Drill four holes with a diameter of 6 mm for the fix-
4.
ing.
Drill the hole depth in accordance with the length of
5.
the screws.
38
Screw the fastening screws into the ceiling.
6.
Screw in the threaded rods.
7.
Screw the nuts approx. 10 mm onto the threaded
8.
rods.
13
4
Preparing the appliance
Remove the grease filters.
1.
To avoid causing damage, do not bend the grease
filters.
Loosen the screws on the side covers.
2.
20
Open the odour filter cartridge.
3.

Publicité

Table des Matières
loading

Table des Matières