Installation; Packing And Unpacking; Installation Area; Electric Connection - Fimar LAV Manuel D'emploi Et D'entretien

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 23

Packing and unpacking

The machine will come packaged in a carton with foamed polyester inserts to guarantee
perfect safety during transport.
Handle the carton in compliance with the instructions.
Open the carton and make sure that all components are intact. Keep the carton for
any future machine removal.
Lift the machine according to the instructions and place it in its selected setting for

installation.

Installation area

The selected machine work setting must be sufficiently lit and have an electric power outlet. The worktop must be
sufficiently large, perfectly level and dry. The machine should be installed in non-explosive environments. In any case,
installation should be carried out by taking into account any applicable industrial safety regulations in force.
Environmental Condition Table
Descriptions
Working temperature
Storage temperature
Relative humidity
Ambient dust

Electric connection

DANGER – CAUTION: Electric connection to the power
mains should be executed by skilled engineers.
Check for the perfect effeciency of the plant grounding system. Make sure
that the line voltage (V) and frequency (Hz) correspond to the machine
ratings (refer to the machine identification plate and wiring diagram). The
machine comes equipped with an electric cable with plug. Plug the
machine into a main wall switch with differential.

Connection to water supply

Connect to water supply according to the istructions.
Proceed as follows:
-
A water tap is to be located before the water check device.
-
Finally connect the appliance drain hose (ref. D) to an
outlet.
Translation of the original instructions
INSTALLATION
Values
0÷35 °C (32÷95 °F)
-15 to +65 °C (from –6.8 to +149 °F)
Maximum 80% at an ambient temperature of 20 °C
Maximum 50% at an ambient temperature of 20÷60 °C
Lower than 0.03 g/m³
Three-phase connection 400V – 3Ph+N
2

Publicité

Table des Matières
loading

Table des Matières