Attendant Control Panel (Acp) - arjo Enterprise 9000X Notice D'utilisation

Lits hospitaliers
Masquer les pouces Voir aussi pour Enterprise 9000X:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Attendant Control Panel (ACP)

Attendant Control Panels are located on the outside panels of both foot end
split side rails. The ACP on the left side and right side of the bed have
different button layouts.
Fig. 19 -
Power on indicator - lights when the bed is connected to the electricity
supply.
Battery indicator - refer to the section "Backup battery" on page 37 .
Mattress
These buttons raise and lower the mattress platform.
platform height
All sections will lower at maximum speed until the bed reaches low height
(40cm*) where it will continue to lower at half speed until it has reached extra
low height (32cm*).
(*Low height and extra low height dimensions are for reference only.)
NOTE
The mattress platform will not lower to extra low height if the bed platform is tilted
(in Trendelenburg or reversed Trendelenburg position).
WARNING
Before lowering the bed, make sure that the space between the mattress frame and
chassis is free of persons, limbs, bedding or other objects.
WARNING
At minimum height, clearance underneath the bed is reduced. Keep your feet away
from the areas below the split side rails and take extra care when using patient hoists
or similar equipment.
Attendant Control Panel (patient's right hand side)
33

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

E9x

Table des Matières