careless assembly. This includes, above all, the
use of safe auxiliary means (e.g. cranes, forklifts
and a sufficient number of people), diverse sup-
ports and a sufficient barrier to prevent unautho-
rised access.
• Carefully remove the lift from the wooden crate
and check for damage.
• Position and align the lift columns according to
the data sheet at the desired set up location.
• Guide the supply line to the operating column
(on-site).
• Connect the electrical cables and measurement
cables to both columns.
• Check the position of the lift again.
• Fill with approx. 17 litres of clean hydraulic oil into
the oil container of the unit.
• Holes for floor anchorings are to be placed
through the holes in the base plates. Clean the
bore holes by blowing them out with air. Guide
the safety anchor into the drilled holes but do not
fasten them yet.
The lift manufacturer recommends Liebig safety
anchors or similar anchors from other reputable
anchor manufacturers Hilti, Fischer (with approv-
al) while following their conditions. Information
can be given from your anchor suppliers.
• Before anchoring the lift, check whether the
load-bearing concrete is of quality min. C20/25
up to the finishing level of the completed floor.
In this case, take the anchor length from "an-
chor length without floor covering". If there is a
floor covering (tiles, screed) on the load carrying
concrete, the thickness of this covering must be
determined and the anchor length selected ac-
cording to "anchor length with floor covering".
• Briefly push the "Lift" button. Consider the rotation
direction of the motor.
• If the lift rail does not lift, the rotation direction
of the motor must be checked again and if re-
quired two phases of the power supply must be
exchanged. (only for 3-phase AC supply).
• Check the precise vertical set up of the lift col-
umns and if required make sure there is a suitable
support (panel strips) that make contact with the
floor.
To prevent vertical oscillations of the column, it
is necessary to position the support in the middle
and not only on the edge of the base plate.
• Tighten the anchor to the required torque (see
the conditions of the anchor manufacturer).
Each anchor must be tightened to the required
!
torque. Safe operation and stability of the lift are
not guaranteed with a lower torque.
• If required, do a reset before first operation. (see
Section 6.3).
• Raise the lift approx. 800 mm.
OPI-POWER LIFT HDL 6500 SST DG-7000 SST DG-8000 SST DG - HYMAX H 6500 DG-H 7000-V1.0-DE-EN-FR-ES-IT
114
• Mount the lifting arm. Secure the bolts with the
locking rings.
• The lift must be moved to the "lift" and "lower"
end positions without a vehicle.
• The safety devices must be checked.
• Move the lift with the load into the end position
several times. (see Section 5.1).
• Check the hydraulic lines again for leak-tightness.
• Check the anchor fastenings again.
i
In case of malfunction, firstly inform customer
service.
8.2

Commissioning

i
Before commissioning, a single safety inspection
must be done (use the "single safety inspection"
form)
If the lift set up is done by a specialist (factory
trained assembler) then he can also do the safety
inspection. If the set up is done by the operating
company then a specialist must be tasked with the
safety inspection. The specialist confirms seamless
operation of the lift on the set up protocol for single
safety inspection and releases the lift for use.
i
After commissioning, the set up protocol must be
completed and sent to the manufacturer.
8.3

Changing the assembly location

To change the assembly location the pre-conditions
must be met according to the assembly guidelines.
The location change is to be done according to
the following sequence.
• Move the lifting stage upwards to approx. 1,000
mm.
• Remove the tank covers
• Remove the lifting arm.
• Lower the lift to the lowest position.
• Disconnect power.
• Loosen base plate anchors.
• Transport the lift to the new assembly location.
• Assemble the lift according to the procedure
during assembly and anchoring before first com-
missioning.
Use new anchors. The old anchors are no longer fit
!
for purpose!
i
Before re-commissioning, a safety inspection
must be done by a specialist (use the regular
safety inspection form)