Transfer Protocol - ATT NUSSBAUM POWER LIFT HDL 6500 SST DG Manuel D'exploitation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Transfer protocol
The system __________________________________________
with serial number ___________________________________ was set up on (date) __________________________
at (company name) _________________________________ in (town, city) _________________________________
checked for function and safety and put into operation.
The following listed people (operators) were trained to handle the lift after it was set up by a trained assem-
bler of the manufacturer or a contract partner (specialist).
(Date, name, signature, empty lines must have a scored out)
_________________________
Date
_________________________
Date
_________________________
Date
_________________________
Date
_________________________
Date
_________________________
Date
Service partner:
OPI-POWER LIFT HDL 6500 SST DG-7000 SST DG-8000 SST DG - HYMAX H 6500 DG-H 7000-V1.0-DE-EN-FR-ES-IT
_____________________________________________
Name
_____________________________________________
Name
_____________________________________________
Name
_____________________________________________
Name
_____________________________________________
Name
_____________________________________________
Name, specialist
_________________________________________________________________________
Stamp
_________________________
Signature
_________________________
Signature
_________________________
Signature
_________________________
Signature
_________________________
Signature
_________________________
Signature of specialist
93

Publicité

Table des Matières
loading

Table des Matières