Télécharger Imprimer la page

fakro LWS-M Manuel D'installation page 6

lv.
Bebee
make sure that you have required tools, manpower,and the
construction of the ceiling is suitablefor installationof the attic
ladder.
Lookfor a spacefreefromobstacles and dangers.Makesurethat
the spacewill allow properinstallation and useof the atticladder.
Make surethatthe lengthof the attic ladder is suitablefor your
ceiling height (Figure4, Table I).
STEP
Choosepotentialinstallationspot. Checkdimensionof the required
opening,referto thetable 2 on page5.
Iftheatticladderwill be installed inthegarageconsider t helocation
of parkedcars.
STEP 2
Checktheswingclearance.Figure 4 and Table1.
STEP 3
Checkthelandingspace,so thatboth legsreston thefloor.Figure
4 Table I.
STEP 4
Iftheatticladderwill fitbetween theceilingioists andthereisnoneed
for cuttingthe joistsproceedaccording to step 7 "Framingthe
n
installatio
opening"Page7-9.
If it isnecessary t o cuttheceilingioistproceedaccordingto step6
"Cutting the ceiling ioists" Page6.
STEPS
Go in to the atticspaceand locatethespotfor installation.
YO
U
can find thislocationby listeningfor tapping from below or
measurethe space below and in the attic area.
STEP 6
Inthe installation spotYOU ShOUld d o thefollowing:
a) checkif thereisenoughroomto work duringtheinstallation
b) make sure there are no obstacles (ie. air ducts, electrical
,
installations
etc.)intheatticareadisabling safeinstallation anduse
of the attic ladder.
In order to check the attic area for the above mentioned obstacles
anddangers putona dustmask, s afetygoggles, g loves and proper
clothes to prevent c utscaused
the layer of insulation,do not in ale dustand other particleswhich
mightbedangerous to yourhealth.
STEP 7
Ifin thechosen spotyoufind anyobstacles, you should findanother
spotfor installation or contact professionals to remove theobstacle
(referto yellowpages).
WAR../ING!
For your ownsafetydo notsiton theceiling northe insulation -
it was not design to carry load. Only the ceiling ioistscan
withstandyour weight. Mind sharp nails stickingout of the
ceiling'sconstruction.Do not nail anythingin to theceilingthat
can conductelectricity untilyou are surethat thereare no electric
wires. Contact with electricwires can be deadly.
FINDING
A SUITABLE
mineral w ool. Next,slowlylift up
LOCATION
FOR INSTAUATION
FC floor ceilingheight
LS landingspace
SC swingclearance
Fig.4. C haracteristics of theatticladder.
MODEL
LWF22h/47
59"
LWF25/47
LWF221/2 154
73
LWF 25/54
65%"
731/4"
LWF 30/54
73%"
65%"
LWS-M27/4
671/2"
57th"
LMS22/47
65 h"
56"
LMS 25/47
65h"
56"
LMS22/54
73
LMS25/54
73 Y4"
LMS 30/54
73%"
LWT22h/47
65 h"
LWT25/47
65 h"
LWT22h/54
65"
LWT25/S4
LWTW54
OLN 22 1/2/47
61W
47 1/4"
OLN22h/54
69"
53 1/4"
MODEL
LSF22/47
68%.
LSF25/47
LST 22/31
LST 27/31
LST 22147
52%"
1ST 25/47
LST22/54
52%" 8'2h"-92Y4
LST 25/54
6
LS
MODEL
75+811"
LWWLWN-P22h/47
641/2" 571/2"
75+811"
LWN/LWN-P25/47
641/2" 571/2" 7'5"+8'11"
TII'+ICI"
LWWLWN-P22h/54
72"
LWN/LWN-P25/54
T 11'* 101"
711'+101'
LWWLWN-P30/54
7'2"+8'1C
LWP22Y2/47
641/2" 571/2"
LWP25/47
641/2" 571/2"
LWP22h/54
72"
7'2"+8
LWP 25/54
7'11"+10'1
LWP30/54
72"
7'11"+10'1
LWP 22 h 154
751/2" 651/2" 8'8h"+10'8"
TII"+ICI"
LWP 25/54
751/2" 651/2" 8'8h"+10'8"
7'5"+811"
LWP30/54
75 h"
7'5"+8'11"
661/2" 581/2"
OWWOWM+22/47
78 + 101"
OWM/OWM-P25/47
661/2" 58h"
78 + 101
OWWOWM-P 22/54
74 W
78+101
OWM/OWM-P 25/54
74 h"
OWWOWM+ 30/54
74 h"
101"
9'21/4"+9'10
9'2W+910
7'5" +8'11
7'1U' + WI"
64"
TIC' + WI"
64"
TIC' + WI"
7'5"+ 8'11
710" + 1011"
64"
65 h"
8'8h"+10'8"
7'2"+811
67+810"
7'11"+10'1"
7'11"+10'1"
64"
7'11"+10'1"
loading

Ce manuel est également adapté pour:

LmsOwmOwm-pLwfLwnLwp ... Afficher tout