STEP
Measurethe lengthof the stringer"NN"betweenthe cros9beams
e
(Figur
18).Themeasurement should beperpendicular totheheaders.
STEP2
Cut the stringer to size. Use timber similar in size to the existing
ceilingjoists.
STEP3
If the joistsdo not makeup the othertwo sidesof the frame,you
needto installonemorestringer o f thesamelengthasbefore. On
Figure 18 only one stringeris neededbecausethe ceiling joist
makes up onesideof theframe.
STEP4
n
Positio
the stringer(or stringers)along the unframedside if the
ceiling opening (Figure 19). The insidedimensions of the frame
shouldbe equalto theceilingopening(seeTable2 on Page5).
STEPS
In orderto install s tringers t o the headers you shouldusenailslong
enoughto go throughboth crossbeamsand enterthestringerat least
" Inmost c ases it should be 20d nail4" long. Square thestringer
and drive 3 nails at each end through the double header. Both
d
measure
dimensions should bewithin1/8" to consider t hemequal.
of
xxx
Fig. 1 8.W- Distance b etween theceilingjoists.
strin
e
Fig. 1 9.
FAKRO AMERICA,
L.L.C.
311 W. Laura
Dr
Addison, IL 60101, USA
tel. (630)
543-1010
e-mail:
sales@fakrousa.com
www.fakrousa.com
www.fakro.com
http://shop.fakrousa.com
"FAKRO" and the FAKRO logo are registered trademarks of FAKRO Group.
All specifications
are subject to change without prior notice.
02009
FAKRO
GROUP
11
er
D
nails
SKYWIN
77 Woodland
Ave
Chatham ON N7L 2S5, CANADA
tel. (519) 352-6587
e-mail:
sales@fakro.ca
www.fakro.ca
www.atticstairsus.com
der