Regulatory And Safety Requirements; Equipment Check And Transportation; Visual Check; Equipment Check - Legrand Keor Dk Rack Manuel D'installation Et D'entretien

Masquer les pouces Voir aussi pour KEOR DK RACK:
Table des Matières
Les langues disponibles

Les langues disponibles

2. Regulatory and safety requirements

Before carrying out any operation on the equipment, it is mandatory to read carefully the
Keor DK Rack UPS manual, especially chapter 2 about regulatory and safety requirements.

3. Equipment check and transportation

3.1

Visual check

Carefully inspect the packaging and the equipment for any damage that might have occurred during
transport.
If there is possible or ascertained damage, immediately inform:
- the transporter and the shipping company.
- the LEGRAND Technical Support Service.
Check that the equipment corresponds with the items indicated in the delivery documentation.
If the UPS must be stored, follow the instructions of chapter 7.
Mechanical damage to the electrical components constitutes a danger to persons and property.
In case of doubt regarding the non-integrity of the package or of the product contained therein, contact
the manufacturer before carrying out the installation and/or the start-up.
3.2

Equipment check

The equipment and the relative supplied accessories must be in perfect conditions.
Check that:
- the shipping data (address of the recipient, no. of packages, order no, etc.) correspond to what is
contained in the delivery documentation.
- the technical rating plate data on the label applied to the UPS correspond with the material described
in the delivery documentation.
- the documentation accompanying the equipment includes the installation and user manuals.
In case of discrepancy, immediately inform the LEGRAND Technical Support Service before
commissioning the equipment.
The content of the supply is subject to thorough checking before the shipment. Nonetheless it is always
advisable to check that it is complete and in order on receiving the material.
The following list is general:
- 5 wires to connect the additional distribution box to the UPS.
- installation manual.
In case of defects and/or missing items, immediately inform the LEGRAND Technical Support
Service before commissioning the equipment.

3.3 Transportation

Avoid bending or deforming the components and altering the insulation distances while
transporting and handling the product.
ADDITIONAL DISTRIBUTION BOX 3 113 74
6
Table des Matières
loading

Ce manuel est également adapté pour:

3 113 74

Table des Matières