4. Installation
All UPS installation operations must be carried out exclusively by a SKILLED TECHNICIAN
qualified and authorized by LEGRAND
manual).
The additional distribution box 3 113 74 can be installed only with Keor DK Rack UPS (3 113
53, 3 113 54, 3 113 55).
4.1
Views
4.1.1 Rear Panel
1.
UPS bypass terminals
2.
UPS input terminals
3.
UPS output terminals
4.
Bypass terminals
5.
Input terminals
6.
Output terminals
7.
PE
8.
Maintenance Bypass Breaker status dry contacts
ADDITIONAL DISTRIBUTION BOX 3 113 74
(check paragraph 2.2.1 Keor DK Rack UPS installation
8