PLAQUE DE BASE DE LEVAGE
LIFT BASE PLATE &
ET ANCRAGES TELS QUE
ANCHORS AS SPECIFIED
SPÉCIFIÉS
Axe lisse #4 x 1'-6" @ 16" intervalle
#4 x 1'-6" SMOOTH DOWEL
CENTRÉ DANS LA DALLE EXIS-
@ 16" O.C. CENTERED
IN EXIST SLAB W/OUT ADHESIVE
TANTE AVEC/SANS COLLE
NOUVELLE PIERRE COMPACTÉE
DE 6" MIN SOUS LA SEMELLE DE
FOOTPRINT OF FOUNDATION
VÉRIFIER 1 500 PSF DE PRESSION DE
VERIFY 1500 PSF MIN ALLOWABLE
PORTANCE MINIMALE ADMISSIBLE
2' - 0"
CL
COLONNE VERTICALE
VERTICAL LEG OF LIFT
DE LEVAGE TELLE QUE
AS SPECIFIED
SPÉCIFIÉE
TYP
ÉGAL
EQUAL
TYPE
3" CLR
CLR 3"
TYP
2' - 0"
MINIMUM
MIN
NEW 6" MIN COMPACTED
CRUSHED STONE BELOW
FONDATION
BEARING PRESSURE
1
2
VARIE - VOIR LES PLANS DE
VARIES-SEE LIFT PLANS
LEVAGE
TYPIQUE
TYP
2' - 0"
2
S-100
CL
ÉGAL
EQUAL
TYPE EN-
6" EMBED
CASTRÉ 6"
TYP
2' - 0"
MIN
MINIMUM
114
COLONNE VERTICALE DE
VERTICAL LEG OF LIFT
LEVAGE TELLE QUE SPÉCIFIÉE 12
AS SPECIFIED
KIP CHARGE MAXIMALE
12 KIP MAX LOAD
VÉRIFIEZ L'ÉPAISSEUR DE LA DALLE
EXIST FLOOR SLAB-ON-GRADE
DU PLANCHER EXISTANT SUR LE
FIELD VERIFY THICKNESS
TERRAIN.
F.F.E. EXISTANT
EXIST F.F.
NOUVELLE FONDATION EN BÉTON DE 3 000
NEW 3,000 PSI (28-DAY STRENGTH) MIN
PSI (RÉSISTANCE À 28 JOURS) MINIMUM
CONCRETE FOUNDATION CENTERED
ON EACH LIFT BASE PLATE
CENTRÉE SUR CHAQUE PLAQUE DE BASE DE
W/ #4 BARS @ 10" O.C. EACH WAY
DU PONT ÉLÉVATEUR AVEC BARRES #4 @ 10"
POSITION REINFORCING AS REQUIRED
d'intervalle DANS CHAQUE SENS, POSI-
TO MISS LIFT ANCHORS
TIONNER LES ARMATURES OUR EVITER LES
ANCRAGES DU PONT ELEVATEUR
Fig. 5b
E.
0"