Télécharger Imprimer la page

Lenze EMB934 Serie Manuel D'instructions page 91

Publicité

Les langues disponibles

Les langues disponibles

Mounting of EMB9341-E / EMB9342-E with fixing rails (standard)
Installation steps
How to mount the regenerative power supply module EMB9341-E and EMB9342-E:
1. Drill holes into the mounting plate of the control cabinet for screwing the
regenerative power supply module:
– The condition of the wall and the mounting material must provide for the
mechanical connection to be long-lasting.
– Observe dimensions and distances of the drill holes .
– Allow a free space of 100 mm at the top and at the bottom.
– Vertical mounting position with mains connection on the top.
2. Push the fixing rails included in the accessory kit in the cardboard into the slots of
the heatsink.
3. Screw the regenerative power supply module and the mounting plate of the control
cabinet together.
– Provide for long-lasting mechanical connections.
EDBMB9340 DE/EN/FR 9.0
Regenerative power supply modules EMB9341 and EMB9342
Mechanical installation
4
91

Publicité

loading

Ce manuel est également adapté pour:

Emb9341Emb9342Emb9343