Mounting The 2 Buried Concrete Blocks Option For Columns 1.5 M / 5 Ft And 2 M / 7 Ft - SORHEA SOLARIS Notice D'installation

Barriere autonome a infrarouge actif
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

SORHEA
4.2

Mounting the 2 buried concrete blocks option for columns 1.5 m / 5 ft and 2 m / 7 ft

Dimensions of the 2 concrete blocks option
Nut M16
Washer Ø16
Concrete block
Assemble the
concrete
1
block option
Anchor bolts M16
Washer Ø16
Nut M16
(Put at the end of
anchor bolt)
400 mm
/
15.75 in
200 mm
100 mm
/
7.87 in
/
3.94 in
Burying height of
the concrete
blocks
- 33 -
SOLARIS
Floor socket SOLARIS 1.50 m / 5 ft
and 2 m / 7 ft
Nut M16
Washer Ø16
Nut M16 for adjustment
Mount the floor
2
socket on the
concrete block.
Make it level
with the
adjustment
nuts.

Publicité

Table des Matières
loading

Table des Matières