Rudder And Tail Gear Installation - Horizon Hobby HANGAR 9 Composite QQ Yak-54 2.6m Manuel D'utilisation

Table des Matières

Publicité

rudder and tail gear installation • • •
1
Mate the rudder hinges with the hinges on the fuselage.
All manuals and user guides at all-guides.com
2
Slowly and carefully insert the hinge rod into the hinges until it is flush with
the bottom of the rudder.
3
Temporarily mount the phenolic T-bracket so that the spring holes line up with
the rudder control horn pivot point. Using a felt pen mark the locations.
31

Publicité

Table des Matières
loading

Table des Matières