Double Section Assembly; Oven Leveling - Blodgett AC-500 Manuel D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation
Oven Assembly

DOUBLE SECTION ASSEMBLY

1. Remove the two knock outs on the top of the
bottom oven.
2. Carefully lift the upper oven and place it on the
bottom oven.
3. With the side panel removed, align the holes
in the bottom of the top oven with the holes in
the top of the bottom oven.
4. Install the 1" long 1/2" bolt through the back
hole in the bottom oven into the nut welded
into the top oven.
5. Install the 1" by 1/2" bolt, 2 washers and nut
in the pass through hole as shown.
WARNING!!
DO NOT move stacked oven until the units
are secured together.
Figure 6
All manuals and user guides at all-guides.com

OVEN LEVELING

After assembly, the oven should be leveled and
moved to the operating location.
1. The oven can be leveled by adjusting the feet
6
WARNING!!
When stacking gas ovens be sure to re-
move the single oven flue boxes prior to
attaching three-piece connector.
AC-500 gas oven stacking
Figure 7
or casters located on the bottom of each leg.
Flue
Connector

Publicité

Table des Matières
loading

Table des Matières