6.2.5 Maintenance at expense of DiBO technicians

For further maintenance (burner, engines, high pressure pump and parts who has to do with safety) we advise
to contact your DiBO distributor concerning a maintenance contract.
The maintenance applies to normal company circumstances.
At heavy circumstances you can communicate this so that can be taken into account.
Supplement documents:
Control manual
CE- certificat
Remarks:
We advise the owner/user at strongest to make an appointment with DiBO against reaching the given up
company hours, to be able to guarantee a good and regular maintenance concerning a maintenance turn.

6.3 Description daily control

6.3.1. Frame

Check the frame in its entirety at loose bolts and/or cracks of the welds.
Keep the machine as much as possible clean to prevent act on dirt, water, oil and messed fuel.

6.3.2. Valves + manometer

At an switched off machine, this means a halted engine, the manometer must reflect 0 bar.
At an maximum performing machine, this means operated at full load working engine, the manometer can not
indicate more than the maximum pressure by DiBO indicated, for your machine.
After operation and releasing the gun can still remain a small pressure remainder present.
The reflected value of the manometer must be between 0-30 bar, the valves are then all right.

6.3.3. High pressure pump

Check the pump on loose connections, bolts, seals and leaks.
Puts the machine on a horizontal base. The oil level must stand halfway the level glass.
Take at doubt the oil level stick separately, where the oil level must stand between both mark lines.
If pump oil gives a milky impression, frequently indicates this on an internal leak as a result of which water
touched oil there. Immediately repair by a DiBO technician is necessary then.

6.3.4. High pressure- and low pressure part

Check the hoses, piping and connections on external damages and leaks.
If damaged or leaks these must be immediately replaced.

6.3.5. Spray tools

Check lances and guns on leaks, external damages and hair cracks.
If damaged or leaks these must be immediately replaced.
Check the spray image of the water jet, if these blows out to much you must replace the nozzle.
Check protective cap-nozzle on damages and replace if necessary.
Check the thread of the couplings on external damages. At damage let these replace without delay.

6.3.6. Electrical part

Checks visible electric wiring and components (among other things switches) on external visible damages.
If damaged let replace the concerning parts.

6.3.7. General control of water- or chemical tank

Check the water tank (if used) on external damages and leaks.
Check at filling of the water tank if the float system works properly.
Fill the tank till the in advance maximum determined value has been reached (technical data, chapter 11).
Important:
At every filling cap, an air release hole has to be provided with a diameter of 6 mm.
So check every filling cap on an air release hole.