Light Bulb Replacement; Fuse Replacement - Textron E-Z-GO Shuttle 2 2007 Manuel D'exploitation Et D'entretien

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

OPERATION AND SERVICE INFORMATION
Read all of Manual to become thoroughly familiar with this vehicle. Pay particular attention to all Notes, Cautions and Warnings
faces, tire inflation pressure should be in the higher
allowable range, but under no condition should inflation
pressure be higher than recommended on tire sidewall.
All four tires should have the same pressure for opti-
mum handling characteristics. Be sure to install the valve
dust cap after checking or inflating.
The vehicle is fitted with low pressure tubeless tires
mounted on one piece rims; therefore, the most cost
effective way to repair a puncture in the tread is to use a
commercial tire plug.
Tire plug tools and plugs are available at most automotive parts
outlets and have the advantage of not requiring the tire be
removed from the wheel.
If the tire is flat, remove the wheel and inflate the tire to
the maximum recommended pressure for the tire.
Immerse the tire in water to locate the leak and mark with
chalk. Insert tire plug in accordance with manufacturer's
instructions.
To reduce the possibility of severe injury, be
s u r e m o u n t i n g / d e m o u n t i n g m a c h i n e i s
anchored to floor. Wear OSHA approved safety
equipment when mounting/demounting tires.
If the tire is to be removed or mounted, the tire changing
machine manufacturer's recommendations must be fol-
lowed in order to reduce possibility of severe injury.
Wheel Installation
To reduce the possibility of component damage, do not
tighten lug nuts to more than 85 ft. lbs. (115 Nm) torque.
It is important to follow the 'cross sequence' pattern when
installing lug nuts. This will assure even seating of the wheel
against the hub.
With the valve stem to the outside, mount the wheel onto
the hub with lug nuts. Finger tighten lug nuts in a 'cross
sequence' pattern (Ref Fig. 12 on page 10). Tighten lug
nuts to 50 - 85 ft. lbs. (70 - 115 Nm) torque in 20 ft. lbs.
(30 Nm) increments following the 'cross sequence' pat-
tern.
Page 10
Ref Whi 2

LIGHT BULB REPLACEMENT

To reduce the possibility of premature bulb failure, do not
touch new bulbs with bare fingers. Use clean, dry tissue
or paper towel to handle the glass portion of the bulb.
For vehicles equipped with lights mounted below cowl,
locate bulb socket on backside of light bar (Ref Fig. 13
on page 11) and turn bulb socket a quarter turn counter-
clockwise to unlock and pull out bulb. Insert new bulb
(Ref. Capacities and Replacement Parts on page 18) and
rotate socket a quarter turn clockwise to secure.
To replace the tail and brake light bulb, remove hardware
securing lens and remove lens (Ref Fig. 14 on page 11).
Install replacement bulb (Ref. Capacities and Replace-
ment Parts on page 18).
To replace the tail and brake light bulb, roll the rubber
bezel from around the edge of the taillight and remove
lens. Install replacement bulb and replace lens.

FUSE REPLACEMENT

To replace fuses, locate the fuse block under the driver
side seat. Pull out old fuse and replace with a new auto-
motive type fuse. Headlight and taillight bulbs and fuses
are available from a local Distributor, an authorized
Branch or the Service Parts Department.
Owner's Manual and Service Guide
Tire/wheel style
may vary
'Cross Sequence'
1
3
2
4
Fig. 12 Wheel Installation
'Cross Sequence'
1
3
4
5
2

Publicité

Chapitres

Table des Matières
loading

Produits Connexes pour Textron E-Z-GO Shuttle 2 2007

Ce manuel est également adapté pour:

E-z-go shuttle 4 2007E-z-go shuttle 6 2007E-z-go te5 2007

Table des Matières