Dibo JMB-S Mode D'emploi page 94

Masquer les pouces Voir aussi pour JMB-S:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

25. Adjustment valve bypass
Through the adjustment valve one can regulate the bypass pressure so that the pressure control valve is function-
ing properly (eg when working at high altitude). This valve is factory set.
26. Safety thermostat chimney
If the temperature on the temperature probe exceeds the setpoint value.
The chimney thermostat will now arrange that the fuel valve and the burner motor will be interrupted directly.
The chimney thermostat can only be reset by means of pushing the green reset button on the thermostat (first
unscrew the black protection) in the burner electric box.
27. Track & trace (option)
The trailer can be equipped with a tracker. The necessary information/data can be achieved via a login on the
tracker website. Also use/reed the delivered manual of the tracker (1.780.510).
Pay attention: when you want to use the Track & Trace, first reconnect the tracker to the battery of the trailer.
This can happen by inserting the delivered fuse of 1A in the fuse holder "F14" (in the burner electric box)
whereby the tracker will charge.
When the tracker has power supply, the tracker will attempt to connect to GPS satellites, which will update the
date and time and the device will receive the correct settings again after which it will send all the logged data to
the platform. The SIM card must have a connection with a mobile phone network to send all relevant data.
28. Professional switch mode battery charger (option)
The trailer with track & trace will be standard equipped with a charging cable (1.701.075) to connect any profes-
sional switch mode battery charger (1.701.210) on the battery.
Pay attention: the battery may not be charged constantly!
The trailer (machine) may not be switched on at any circumstances during the charging procedure!
For info: If the battery clamps are incorrectly connected, the reverse polarity protection will ensure that
the battery and charger are not damaged. Estimated time for charging (for an empty battery): +- 20h.
The charger is designed for charging only for batteries according to the technical specification.
See also the delivered manual of the professional switch mode battery charger.
JMB-S : REV A
DiBO n.v. 94

Publicité

Table des Matières
loading

Table des Matières