Eaton xChargeIn A Serie Manuel D'installation page 214

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 373
xChargeIn
6) Using a hammer and flat-head screwdriver, gently knock out the re-
7) Insert the cable glands (surface-mounted cable insertion) or double-
The charging station is now ready for installation.
To mount the charging station, proceed as follows:
1) Mark the 4 holes
Fig. 6-14: Drilling template
2) If there is a cable holder, mark the cable holder holes
3) Drill boreholes and, if necessary, insert anchors in the holes.
Installation manual V1.01
© EATON
quired cable insertion openings
− Surface-mounting cable insertion: Cable insertion openings on the top
side
− Flush-mounting cable insertion: Cable insertion openings on the back
side
membrane seals (flush-mounted cable insertion) into the corresponding
cable insertion openings.
1
in the designated location on the wall. The supplied
drilling template can be used for this purpose.
1
... Mounting holes
3
... Cable holder holes
Mounting and installation instructions
2
... Cable insertion openings
3
.
27

Publicité

Table des Matières

Dépannage

loading

Ce manuel est également adapté pour:

Xchargein x serieXchargein s serieXchargein m serie

Table des Matières