Space Requirements; Required Tools - Eaton xChargeIn A Serie Manuel D'installation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 373
xChargeIn
6.2

Space requirements

Fig. 6-13: Space requirement, specified in mm
In the case of device variants with optional cable holder, sufficient additional
space must be planned for at the bottom for hanging up the charging cable.
If several charging stations are installed adjacent to each other, a distance of
at least 200 mm between charging stations must be complied with.
Information
We recommend mounting the charging station (height of the charging
socket) at a height of 1.2 m. Observe that national regulations can limit this
height.
6.3

Required tools

The following tools are required for the installation:
Installation manual V1.01
© EATON
Drill suitable for subsurface with diameter 10 mm
Screwdriver/bit T25
Socket wrench 13 mm
Mounting and installation instructions
25

Publicité

Table des Matières

Dépannage

loading

Ce manuel est également adapté pour:

Xchargein x serieXchargein s serieXchargein m serie

Table des Matières