Orved Evox 25 Mode D'emploi Et D'entretien page 44

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

MAINTENANCE
6) Lift the machine body using both hands and lay it on the
front (on the work table) (Fig. 9).
7) Use a setscrew wrench to undo the oil filling cap at the top
of the pump (Fig. 10).
8) Place a container large enough (0,5 L) close to the drainage
hole (Fig. 11). Remove the rubber seal (Fig. 11a). Use the
same wrench to undo the drain cap and leave the oil to flow
into the container for about ten minutes (Fig. 11b).
Fig. 11
EVOX 25h
44
Rev. 02 - 05/2016 - Cod. 1500015 - Instruction manual for vacuum chamber packaging machines EVOX 25 / EVOX 25 H
EVOX 25
Fig. 10
Fig. 11a
(Pump 8mc/h)
90°
(Pump 4mc/h)
Fig. 10
Fig. 9
Fig. 11b

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Evox 25 h

Table des Matières