Installation

2 .1 Installation Requirements

Be certain that three phase current is available at the point
of installation (see „Technical data", p.  27 for information
concerning required pre-fusing of the electrical outlet).
Note: Since this machine can weigh up to 1256 kg, it is es-
sential to check the permissible load per square meter of
the floor.

2 .2 Installation of the hopper

1 . Release the transport lock (binder) on the outlet flap
(fig. 1/1) and fold the flap down.
2
3
1
1
Discharge flap
2
Hopper
3
Cover flap
4
Electrical outlet
5
Inlet flap
fig. 1 Flaps and hopper
2 . Take the hopper (fig. 1/2) out of the press compartment,
as shown, place over the filler opening and fix to the
press from inside with the aid of the 7 hexagon socket
screws M6x12.
3 . Swivel the brush strip (fig. 2/6) on the hopper up until
the brush is pointing in the direction of the press com-
partment. Fix the brush strip to the hopper in this po-
sition with the two M6x16 hexagon socket screws and
washers provided (use upper hole for fixing).
4 . Remove both switch covers (fig. 2/1+2). Fix the limit
switch S8 with 2 screws M4x40 and nuts M4 below the
switch cam of the switch flap (fig. 2/8). Undo the threa-
ded pin (fig. 2/9) (Allen key 2.5 mm), turn the cam into
position and tighten the threaded pin again.
NOTE!
the switch cam must be turned in such a way that
with the switch flap hanging straight down, the
switch pin of the switch is situated in the recess of
the switch cam.
5 . Fix the limit switch S9 with 2 screws M4x40 and nuts M4
under the switch cam of the cover flap (fig. 2/4). Undo
the threaded pin (fig. 2/9) (Allen key 2.5mm), turn the
cam into position and tighten the threaded pin again.
94710 1 02/18
4
3
2
1
000129
4
5
000204
fig. 2 Hopper
6 . Position the two switch covers (fig. 2/1+2) over the limit
7 . Open cover flap (fig. 2/4). Check/correct position of se-
fig. 3 Security angle jam crowding
NOTE!
The switch cam must be turned so that when the
cover flap is closed, the switch pin of the switch is
situated in the recess of the switch cam.
5
6
1
Cover limit switch S9
2
Cover limit switch S8
3
Hopper
4
Cover flap
5
Switch flap
6
Brush strip
7
Angle bracket
8
Switch cam
9
Threaded pin
switches and fix each to the hopper with two screws
M5x16 and nuts M5.
curity angle (fig. 3):
SC (Stripe cut) machines: position up
CC (Cross cut) machines: position below
16.86 SmartShred
8
7
9
000131
17