HBM K-OP Instructions D'emploi page 12

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

12
Installing optical strain gages
Fig. 3.2.3: Gluing on the optical strain gage
It is recommended to wait five minutes before removing the Teflon
film.
Subsequently, the fibers close to the optical strain gage must be fixed to the
surface for strain relief with two drops X60 adhesive, see Fig. 3.2.3.
Fig. 3.2.4: Fixing the optical fibers in place with X60 adhesive
After the X60 adhesive has hardened for 10 minutes, all adhesive strips and
the installation aid can be removed. The adhesive strips should be pulled off
at an angle to the surface, see Fig. 3.2.5.
HBM
A2397-3.2 en/de/fr

Publicité

Table des Matières
loading

Table des Matières